Licensed local expertise
Chris Rawcliffe, proprietor and master electrician. Licensed and insured. ECRA/ESA #7015457. Call 705-309-5441.
When you need a panel upgrade
100 amp service that’s maxed out
Adding a Level 2 EV charger
Installing a standby generator and transfer switch
Hot tub, workshop, or basement suite
Older fuse or Federal Pacific / problematic panels. We’ll tell you what we find on site.
What we do
We coordinate with your local hydro utility when a service or meter change is required.
On-site look at your panel, load, and Hydro/meter setup
Clear quote, with no surprise extras in the fine print
Permits and ESA inspection
Install and label the new panel, test, and walk you through it
Related work
Many panel jobs pair with EV charger installation, generator installation, or transfer switch installation.
Service area
Barrie (Holly, Painswick, waterfront, east end), Innisfil, Springwater (Midhurst, Minesing), Oro-Medonte (Horseshoe Valley, Shanty Bay), and Simcoe County.
Frequently asked questions
Do I need a 200 amp panel for an EV charger?
Not always. Many homes need one when the charger adds to electric heat, a dryer, a well pump or a hot tub. Some homes can add a charger on 100A with a load calculation and load management. We check before you buy equipment.
How long does a panel upgrade take?
Most residential panel swaps are about a day of on-site work, plus scheduling time with the utility and ESA. We give you a timeline with your quote.
Do you pull the permit?
Yes. We file the ESA permit, arrange the inspection, and coordinate with your utility when the service has to change.
How much does an electrical panel upgrade cost?
It depends on your existing service, the distance to the meter, whether the utility has to change the service, and what’s being added. We give you a firm price after a free on-site assessment.
Will I lose power during the upgrade?
Yes, for part of the day while the panel is swapped. We’ll tell you the expected window ahead of time so you can plan around it.


